Fleeces, Nettings, Wallpapers

HF+LF / Shielding fleece HNV80 / 1 linear meter

HF+LF / Shielding fleece HNV80 / 1 linear meter

Nylon fleece, 80 dB attenuation (99.999999 % shielding effectiveness).
Professional product now available for home use! Universal usage for all interior applications.

18,40 EUR - 16,80 EUR

 excl. shipping costs

18,40 EUR per square meter

Delivery time: 1 working day, plus parcel lead time

LF / YSHIELD carbonized shielding fabric NCG34 / 1 linear meter

LF / YSHIELD carbonized shielding fabric NCG34 / 1 linear meter

Replacement for "Rubens-Plus": Carbonized glass-fabric for the protection against low-frequency (LF) electric fields. 46 dB attenuation. Used as tear-resistant mattress pad.

10,84 EUR - 9,24 EUR

 excl. shipping costs

10,84 EUR per square meter

Delivery time: 2-3 working days, plus parcel lead time

LF / YSHIELD carbonized shielding fleece NCV34 / 1 linear meter

LF / YSHIELD carbonized shielding fleece NCV34 / 1 linear meter

Replacement for "Rubens-Plus": Carbonized glass-fleece for the protection against low-frequency (LF) electric fields. 50 dB attenuation. Used under wallpaper, loosely laid, etc.

10,00 EUR - 8,40 EUR

 excl. shipping costs

10,00 EUR per square meter

Delivery time: Approx. 1 week, plus parcel lead time

HF+LF / Shielding stainless steel gauze HEG14 / 1 linear meter

HF+LF / Shielding stainless steel gauze HEG14 / 1 linear meter

Semi-transparent stainless steel gauze, 43 dB attenuation (99.995 % shielding effectiveness).

15,04 EUR - 13,44 EUR

 excl. shipping costs

15,04 EUR per square meter

Delivery time: 1 working day, plus parcel lead time

HF+LF / Shielding stainless steel gauze HEG05 / 1 linear meter

HF+LF / Shielding stainless steel gauze HEG05 / 1 linear meter

Highly transparent stainless steel gauze, 38 dB attenuation (99.98 % shielding effectiveness).
Due to it´s high optical transparency of 88 % perfect as flyscreen.

30,17 EUR - 28,01 EUR

 excl. shipping costs

24,33 EUR per square meter

Delivery time: 1 working day, plus parcel lead time